1.1 Slretch the steel plate into a botom plate through stamping process. 2.1 Use spol welding and riveing processes io weld the floor panels andbottom plates iogether, forming the basic, structure of the floor.
2.1 Conducl high,femperature degreasing ceaning,surface adjustment, phosphaling cleaning and other treatmenls on the focr toenhance ils surface quality and anii-. corrosion perormance.
2.2 Ater phosphating treatmenit, dry the floor lo ensure the stabiity of the materiaL.
2.3 endawv the fioar with ani-comosion and ani-stalic propertles through spray coaing treatmenl, and then carry out curing trealmenL
inject foam coment inlo the internal siructure of the foor to enhance its relatie density and unlform dislributian, and improve the load. bearing capacity of the foor.
Apply anti-static materials such as PVC.HPL, and ceramic tiles to the surface of the floor to improve its aesthetics and perfor mance.
Conduct performance testing on the produced flooring,such as resistance testing, load-bearing capacity festing, etc., to ensure compliance with relevant slandards and customer requirements.
Package the floor that has passed the inspection to protect it from damage during transportation, and dliver the foor ta the designated location according to customer requirements.